Insulated Glass
Product Introduction
Domestic double-layer glass, that is, soundproof and heat-insulating double-layer glass, is a high-efficiency building material widely used in modern home decoration. It is usually composed of two or more pieces of glass. Through a high-strength, high-airtightness composite adhesive, the glass pieces are bonded to an aluminum alloy frame containing a desiccant to form a highly efficient soundproof and heat-insulating hollow glass. This glass not only has excellent soundproof and heat-insulating properties, but also has good light transmittance and aesthetics.
Production Process
1. Material selection Select high-quality glass sheets and select the required thickness according to requirements.
2. Glass cutting Precise cutting to ensure cutting quality and accuracy.
3. Glass edge grinding Fine grinding, edge grinding of the cut glass to eliminate sharp edges and fine cracks and improve the smoothness of the edges.
4. Washing and drying Wash the edged glass to remove dust, oil and impurities on the surface to ensure subsequent bonding. Drying is required after washing to prevent moisture from affecting the subsequent processing.
5. Tempering The principle is to form a layer of compressive stress on the surface of the glass to prevent the glass from breaking, so as to improve the strength of the glass and better resist breaking. Even if it breaks, it is small particles, which greatly reduces the possibility of injury.
6. Aluminum spacer processing and filling desiccant According to the design requirements, use an aluminum strip bending machine to bend the aluminum spacer into a frame. Fill the aluminum spacer with molecular sieves. The function of the molecular sieve is to absorb the moisture in the hollow layer and keep the air dry.
7. Butyl glue and frame gluing Apply butyl glue evenly on the edge of the aluminum spacer to ensure the sealing of the hollow layer. Glue the aluminum spacer coated with butyl glue to the first piece of glass, and then glue the second piece of glass to the other side of the aluminum spacer to form a closed hollow layer.
8. Pressing and applying structural glue The well-mixed insulating glass is sent to the tablet press for pressing, and the glass and the aluminum spacer fit tightly. Apply structural glue on the frame of the insulating glass to enhance the sealing and stability.
Product Specifications
Aluminum strip thickness | 6A, 9A, 12A, 15A, 18A, 20A, 22A, 24A, 27A. |
Single piece thickness | 5mm, 6mm, 8mm, 10mm, 12mm, etc. |
Finished product thickness | such as 5mm 9A 5+9A+5 19mm / 6mm 15A 6+15A+6 27mm |
Original sheet specifications | 3300x2440mm, 3660x2250mm, 3660x2440mm, 3660x2740mm, etc. |
Customized according to customer needs. |
Application
Domestic double-glazed windows are suitable for various home environments, such as bedrooms, living rooms, study rooms, etc., where quietness and temperature stability are required.
Technical Features
Thermal insulation, efficient sound insulation, energy saving and environmental protection, safety and durability, etc.
Our services
Pre-sales service: provide samples;
Welcome to visit the factory; timely reply; professional sales team. Production cycle service: professional customization; timely update of progress; strict quality inspection;
Installation guidance: provide customers with installation guidance services for glass products to ensure the correct installation and use of the products.
After-sales service: regular follow-up; provide installation guide; timely solve after-sales problems.
FAQ
Q: What certificates have you passed?
A: After identification by relevant professional institutions, the company has passed 3C certification, environmental protection system certification and other quality system certifications.
Q: What is the minimum order quantity?
A: We welcome any quantity you need to order.
But a competitive price always depends on the gradual increase in quantity.
Q: Can you provide a quotation?
A: Yes, please provide you with the product name, specifications, and quantity you need, and I will give you a quotation as soon as possible.
Q: How long is the production cycle?
A: After the order is confirmed, delivery within 7-15 days.